Terms of Reference (TOR) : Detailed environmental impact assessment for the proposed integrated cement plant in Mukim Chiku, District Gua Musang, Kelantan Darul Naim, Malaysia

The project title is proposed integrated cement plant in Mukim Chiku, District Gua Musang, Kelantan Darul Naim. The project located at PT11051 while limestone quarries and clay pit are located within Relai Utara Forest Reverse.

Main Author: Izan Jaafar
Language:English
Published: Kuala Terengganu, Malaysia: Universiti Malaysia Terengganu, 2016.
Series:Nota Kuliah DEIA
LEADER 01164cam a2200217 7i4500
001 0000145135
005 20171004090000.0
002 0000010245
008 170314s2016 my a xw 0 eng
090 0 0 |a KAS 4502.05   |b .I9 2016 
100 0 # |a Izan Jaafar   |q Dr.  
245 1 0 |a Terms of Reference (TOR) :   |b Detailed environmental impact assessment for the proposed integrated cement plant in Mukim Chiku, District Gua Musang, Kelantan Darul Naim, Malaysia   |c Izan Jaafar. 
246 |a DEIA. 
260 # # |a Kuala Terengganu, Malaysia:   |b Universiti Malaysia Terengganu,   |c 2016. 
300 |a p.:   |b ill., maps;   |c 30 cm.. 
490 0 0 |a Nota Kuliah DEIA 
502 # # |a Detailed Environmental Impact Assessment 
505 0 0 |a vol.1: Terms of Reference (TOR); vol.2: SoP 
520 0 # |a The project title is proposed integrated cement plant in Mukim Chiku, District Gua Musang, Kelantan Darul Naim. The project located at PT11051 while limestone quarries and clay pit are located within Relai Utara Forest Reverse. 
999 |a 1100099416  |b Book  |c Koleksi Buku Berbintik Merah (Red Spot)  |e KOLEKSI KHAS 
999 |a 1100099417  |b Book  |c Koleksi Buku Berbintik Merah (Red Spot)  |e KOLEKSI KHAS