|
|
|
|
LEADER |
00913cam a2200229 7i4500 |
001 |
0000012157 |
005 |
20140710090000.0 |
008 |
100712s1997 mau eng |
020 |
0 |
0 |
|a 0201633914 (hardcover : alk. paper)
|
090 |
0 |
0 |
|a HD 58.87
|b .T4 1997
|
100 |
1 |
0 |
|a Tenner, Arthur R.
|
245 |
1 |
0 |
|a Process redesign :
|b the implementation guide for managers
|c Arthur R. Tenner, Irving J. DeToro.
|
260 |
0 |
0 |
|a Reading, Mass.:
|b Addison Wesley Longman, Inc.,
|c 1997.
|
300 |
# |
# |
|a xx, 332 p.:
|b ill.;
|c 24 cm..
|
490 |
0 |
0 |
|a Engineering process improvement series
|
504 |
0 |
0 |
|a Includes bibliographical references and index
|
590 |
# |
# |
|a Pusat Pengajian Pembangunan Sosial dan Ekonomi
|
650 |
0 |
0 |
|a Total quality management
|
650 |
0 |
0 |
|a Reengineering (management)
|
700 |
1 |
1 |
|a DeToro, Irving J.
|
999 |
|
|
|a 1000387722
|b Book
|c Open Shelf
|e KOLEKSI TERBUKA
|
999 |
|
|
|a 1000384263
|b Book
|c Open Shelf
|e KOLEKSI TERBUKA
|